IRC 37 example check
Enter the traffic, subgrade and trial pavement composition; the pavement is analysed (layered elastic theory, standard axle) and checked to IRC:37-2018 as you type. Thicknesses in mm, moduli in MPa.
Project
Road and traffic (Cl. 4)
Subgrade (Cl. 6)
Trial pavement composition (Sections 5, 7 - 9)
Bituminous mix (Cl. 9, Table 9.2)
0 = Table 9.2 value
Cement treated layers (Cl. 7.3, 8.2)
20 % of 28-day UCS, max 1.4
600 (400 for UCS 0.75 - 1.5)