Enter geometry, materials, soil properties and loading. Units are shown with each field.
Identification printed on the report and drawings.
Cells are of equal clear span. Thicknesses in metres.
Proportioned nominally for GAD and BOQ.
At both barrel ends, on a headwall up to road level; continued over the approach slabs.
Approach slab top flush with top slab; one end rests on a bracket cast with the outer wall.
Vehicles are moved across the span in both directions.
IRC 6:2017 Table B.2. Relieving factors are 1.0 for permanent and 0 for variable actions.
Unit rates used for the cost estimate.